Schwarzenbek Elevated Street Bridge

General Information

Beginning of works: July 1990
Completion: July 1992
Duration of works: 2 years
Status: in use

Project Type

Location

Location: , , ,
Address: B207
Coordinates: 53° 30' 17.64" N    10° 28' 40.86" E
Show coordinates on a map

Technical Information

Dimensions

total length 318 m
span lengths 24.0 m - 9 × 30.3 m - 21.3 m
bridge surface 4 770 m²
deck deck width 15.00 m

Quantities

concrete volume 8 300 m³
prestressing steel 127 t
reinforcing steel 655 t

Design Loads

live load Brückenklasse 60/30 (DIN 1072)

Cost

cost of construction ca. German Mark 15 300 000
cost of construction per m² German Mark 3 207

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001137
  • Date created
    25/11/2000
  • Last Update
    14/11/2016