• de
  • en
  • fr
  • International Database and Gallery of Structures

Schierholzstrasse Bridge

General Information

Beginning of works: 1995
Completion: 1996
Status: in use

Project Type

Structure: Truss arch bridge
Tied-arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Crosses:
  • Mittellandkanal
Part of:
Replaces: Schierholzstrasse Bridge (1913)
Coordinates: 52° 24' 0.71" N    9° 49' 15.30" E

Technical Information

Dimensions

span 67.30 m
total width 20.90

Materials

deck steel
arches steel tubes
abutments reinforced concrete

Chronology

January 1995

Construction begins.

June 1996

Completion.

June 1996

Opened to traffic.

Participants

Design
Architecture
Structural engineering
Checking engineering
  • Beil (checking engineer)
Main contractor
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008719
  • Date created
    21/03/2003
  • Last Update
    20/07/2017