• de
  • en
  • fr
  • International Database and Gallery of Structures

Sanibel Causeway Bridge (C)

General Information

Beginning of works: 2005
Completion: 8 September 2007
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Road bridge

Location

Location: , , ,
, , ,
Connects to: Sanibel Causeway Bridge (B) (2007)
Coordinates: 26° 27' 30.21" N    82° 2' 2.97" W

Technical Information

There currently is no technical data available.

Participants

Relevant Web Sites

Relevant Publications

  • Sanchez, Ronald (2006): Highs and lows. In: Bridge Design & Engineering, v. 12, n. 42 (1st Quarter 2006), pp. 26-27.
  • About this
    data sheet
  • Structure-ID
    20019990
  • Date created
    13/03/2006
  • Last Update
    05/02/2016