• de
  • en
  • fr
  • International Database and Gallery of Structures

Russeintobel Bridge

General Information

Beginning of works: January 1857
Completion: 10 November 1857
Duration of works: 11 months
Status: in use

Project Type

Structure: Howe type truss bridge
Through truss bridge
Covered bridge
Function / usage: original use:
Road bridge
current use:
Pedestrian bridge (footbridge)
Material: Wooden bridge

Location

Location: , ,
, ,
Coordinates: 46° 43' 18.10" N    8° 53' 46.30" E

Technical Information

Dimensions

main span 56.2 m
width 4.2 m
total length 61 m
height above valley floor or water 45.5 m

Cost

cost of construction Swiss Franc 41 000

Materials

truss wood

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20002212
  • Date created
    09/11/2001
  • Last Update
    05/02/2016