• de
  • en
  • fr
  • International Database and Gallery of Structures

Roosevelt Bridge

General Information

Completion: 1998
Status: in use

Project Type

Structure: Box girder bridge
Construction method: Segmental construction
Material: Prestressed concrete bridge

Location

Location: , , ,
Crosses:
  • Saint Lucie River
Carries:
  • U.S. Route 1

Technical Information

Dimensions

total length 2 x 2 902 m
number of spans 41
weight of precast segments 55 - 75 t

Quantities

number of precast hollow box elements 1 112

Cost

cost of construction United States dollar 43 000 000

Materials

superstructure precast prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20004486
  • Date created
    15/08/2002
  • Last Update
    05/02/2016