• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Rendsburg High Bridge

General Information

Name in local language: Hochbrücke Rendsburg
Beginning of works: 1911
Completion: 1 October 1913
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • North & Baltic Sea Canal
Part of:
Coordinates: 54° 17' 36.86" N    9° 40' 58.06" E

Technical Information

Dimensions

height 68 m
total length 2 486 m
clearance 42 m
main bridge
length 317 m
span lengths 77.3 m - 140 m - 77.3 m

Quantities

structural steel 17 740 t

Cost

cost of construction Goldmark 13 400 000

Materials

cables steel
piers steel
truss steel

Products, Services & Reports

An overdue inspection of the railway viaduct in Rendsburg has been carried out with a WEMO-tec road-rail MBL 1.600T unit. The soffit and the stee ...

[more]

Participants

Initial construction (1911-1913)
Design
Construction
Contractor
Strengthening (2011)
Structural engineering
Principal Inspection (2010)
Inspection services

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20002052
  • Date created
    30/09/2001
  • Last Update
    21/04/2016