0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Barragem de Pracana
Beginning of works: 1947
Completion: 1950
Status: in use

Project Type

Structure: Buttress dam
Function / usage: Hydroelectric dam / plant
Material: Concrete dam

Location

Location: ,
,
Impounds:
  • Ocreza River
Coordinates: 39° 33' 53.79" N    7° 48' 43.80" W
Show coordinates on a map

Technical Information

Dimensions

height 60 m
retained water volume 116.5 hm³
crest length 255 m
dam volume 129 000 m³

Materials

dam structure concrete

Excerpt from Wikipedia

Pracana Dam (Portuguese:Barragem de Pracana) is a concrete buttress dam on the Ocreza, a right (northern) tributary of the Tagus. It is located in the municipality Mação, in Santarém District, Portugal.

Construction of the dam began in 1947. The dam was completed in 1950. It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE). The dam is used for power generation.

Dam

Pracana Dam is a 60 m tall (height above foundation) and 245.5 m long buttress dam with a crest altitude of 115 m. The volume of the dam is 144,000 m³. There is one shaft spillway on the right side of the dam and a chute spillway on the left side. The combined maximum discharge is 2,560 m³/s. There is also a bottom outlet which can discharge up to 52 m³/s.

Reservoir

At full reservoir level of 114 m the reservoir of the dam has a surface area of 5.5 km² and a total capacity of 111.9 mio. m³. The active capacity is 69 (95.6 or 102) mio. m³. Minimum operating level is 97 m. With the 95.6 mio. m³ 9.8 GWh can be produced.

Power plant

The hydroelectric power plant was commissioned in 1951 (1950). It is operated by EDP. The plant has a nameplate capacity of 41 (14,7 or 40) MW. Its average annual generation is 63.8 (41, 61.8, or 53) GWh.

The power station contains 3 Francis turbine-generators in a surface powerhouse located at the toe of the dam. The first 2 units were commissioned in 1951, the third in 1993. The minimum hydraulic head is 28 m, the maximum 57 m.

Unit Commission date Turbine (MW) Generator (MVA) Rotation Flow (m³/s) 1 1951 8 9.68 375 18 2 1951 8 9.68 375 18 3 1993 25 28.5 272.7 52

Text imported from Wikipedia article "Pracana Dam" and modified on 23 July 2019 under the CC-BY-SA 3.0 license.

Participants

Owner

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20012732
  • Published on:
    03/08/2004
  • Last updated on:
    11/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine