• de
  • en
  • fr
  • International Database and Gallery of Structures

Pont Pierre Bérégovoy

General Information

Beginning of works: 1992
Completion: 1995
Status: in use

Project Type

Location

Location: , , ,
, , ,
Carries:
  • Autoroute A77
Crosses:
  • Loire River
Part of:
Coordinates: 46° 58' 30.57" N    3° 11' 51.61" E

Technical Information

Dimensions

total length 420 m
deck span lengths 55 m - 4 x 60 m - 70 m - 55 m
deck width 10.69 m
deck slab thickness 22 - 33 cm
girder depth 1.94 m

Quantities

deck structural steel 2 050 t
concrete volume 2 500 m³
paint 20 000 m²

Materials

girder steel
deck slab reinforced concrete

Chronology

1 September 1992

Construction begins.

1 March 1995

Completion.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Deuxième pont sur la Loire à Nevers. In: Bulletin ponts métalliques, n. 18 ( 1996), pp. 160-162.
  • Barbier, Laurent / Berthellemy, Jacques / Bonnot, Maurice / Dugas, Pierre / Gillet, Philippe / Grenery, Jean-Pierre / Lacombe, Jean-Michel / Metgtery, Hervé / Moulet, Pascal / Poineau, Daniel / Valette, Jean-Paul / Virlogeux, Michel (1997): Le nouveau pont sur la Loire à Nevers (Nièvre). In: Travaux, n. 733 (July - August 1997), pp. 30-48.
  • About this
    data sheet
  • Structure-ID
    20003402
  • Date created
    28/05/2002
  • Last Update
    21/04/2016