Completion: 1983
Status: in use

Project Type

Location

Location: , , ,
Address: Plymouth Avenue
Crosses:
  • Mississippi River
Coordinates: 44° 59' 35" N    93° 16' 24" W
Show coordinates on a map

Technical Information

Dimensions

main span 43 m
length 287.7 m

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Case Studies and Applied Products

Repair of the Plymouth Avenue Bridge in Minneapolis, USA

Repair of the Plymouth Avenue Bridge in Minneapolis, USA

The Plymouth Avenue Bridge is a four lane, twin segmental box girder bridge carrying Plymouth Avenue over the Mississippi river on the north side of Minneapolis, Minnesota. The bridge has a total length of 287.4 m (943 ft), with the long ... [more]

Excerpt from Wikipedia

The Plymouth Avenue Bridge is a segmental bridge that spans the Mississippi River in Minneapolis, Minnesota. It was built in 1983 and was designed by VanDoren-Hazard-Stallings. The construction of this bridge was unique, for it was the first segmental concrete girder bridge built in Minnesota. This method of design uses a "form traveler" that shapes the concrete as it is built out from the piers. This avoided the use of falsework and avoided impeding river traffic. The concrete is also engineered to be salt-resistant by the use of post-tensioning. Tubes run through the concrete structure carrying strands of cable. With tension on the cables, the structure is designed to be under compression. This prevents cracks and hinders the intrusion of salt water. Since then, other bridges in Minnesota have used this construction method, including the I-35W Saint Anthony Falls Bridge in Minneapolis, the Wabasha Street Bridge in downtown St. Paul and the Wakota Bridge in South St. Paul.

The original bridge was a wooden Howe truss design, built in 1873. This was built when Minneapolis, then only on the west side of the river, consolidated with the city of St. Anthony, on the east side of the river. As part of the merger, Minneapolis (the western city) agreed to build two bridges, one upstream of the Hennepin Avenue Bridge and one downstream. That bridge was replaced in 1886 with an iron truss bridge. It was remodeled in 1913 and then raised in 1953 for more clearance. As a result of deterioration over the years, the bridge was closed in 1981 because the floor beams were rusted.

On Friday, October 22, 2010, the Plymouth Avenue Bridge was closed indefinitely "as a precaution, pending further investigation after a routine inspection discovered corrosion on cables that run through the bridge." The bridge was reopened to foot traffic on Thursday, January 6, 2011 after engineers determined that the bridge was safe for pedestrian and bicycle use. Use by vehicular traffic was not allowed until corroded cables could be replaced, a project that, following several delays, was completed as of August 9, 2013.

Text imported from Wikipedia article "Plymouth Avenue Bridge" and modified on 23 July 2019 under the CC-BY-SA 3.0 license.

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20029671
  • Published on:
    02/08/2007
  • Last updated on:
    08/09/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine