Advertisement

Share

Follow

Opfikon-Oberhausen Bridge

General Information

Completion: 1956
Duration of works: 5 months
Status: in use

Project Type

Structure: Rigid frame bridge with inclined legs
Function / usage: original use:
Road bridge
current use:
Bicycle and pedestrian bridge
Material: Prestressed concrete bridge

Location

Location: , ,
Crosses:
  • Glatt
Coordinates: 47° 25' 35.93" N    8° 34' 25.75" E
Show coordinates on a map

Technical Information

Dimensions

width 8.50 m
total length 38.80 m
span lengths 7.90 m - 23.00 m - 7.90 m
length between springing axes 31.00 m
roadway / carriageway width 5.50 m
walkway width 2 x 1.70 m

Quantities

concrete volume 200 m³

Cost

cost of construction Swiss Franc 118 000
cost of construction per m² Swiss Franc 342

Materials

deck prestressed concrete
abutments reinforced concrete
portal legs reinforced concrete

Advertisement

Participants

Design
Structural engineering
Contractor
Prestressing
Construction supervision

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20074264
  • Date created
    27/11/2017
  • Last Update
    28/11/2017