0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Stara Ćuprija
Beginning of works: 1682
Completion: 1683
Status: in use

Project Type

Location

Location: , ,
Coordinates: 43° 39' 3.85" N    17° 57' 45.85" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 8.29 m - 11.78 m - 13.52 m - 13.258 m - 11.424 m - 6.77 m
number of spans 6
pier 1 width 2.99 m
pier 2 width 3.04 m
pier 3 width 3.12 m
pier 4 width 3.07 m
pier 5 width 3.04 m

Materials

piers stone
arches stone

Chronology

March 1945

The bridge is dynamited by the retreating German army, causing heavy damage to the arches while leaving the piers mostly intact. After the war, the bridge is temporarily repaired using steel beams to create a deck surface over the piers.

2003 — 2009

The bridge is restored to ist original appearance.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20051351
  • Published on:
    06/01/2010
  • Last updated on:
    15/01/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine