Nymburk Bypass Bridge

General Information

Beginning of works: 2004
Completion: 2007
Duration of works: 33 months
Status: in use

Project Type

Structure: Cable-stayed bridge with harp system
deck of approach viaduct:
Double T-section girder bridge
Function / usage: Road bridge
Material: Steel-concrete hybrid bridge
deck of approach viaduct:
Prestressed concrete bridge
main span:
Steel-reinforced concrete composite bridge

Location

Location: , ,
Crosses:
  • Elbe River
Coordinates: 50° 9' 56.55" N    15° 5' 23.19" E
Show coordinates on a map

Technical Information

Dimensions

main span 132 m
length 531.60 m
span lengths 35 m - 4 × 41 m - 132 m - 4 × 41 m - 35 m

Advertisement

Participants

Design
Main contractor
Co-contractor
Steel construction
Material supplier
Expansion joints

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20031220
  • Date created
    14/03/2008