• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Nuttlar Viaduct

General Information

Name in local language: Talbrücke Nuttlar
Official designation: BW 189
Beginning of works: 2011
Completion: 2016
Status: in use

Project Type

Location

Location: , , ,
Carries: A 46 Motorway (Germany)
Coordinates: 51° 22' 45.65" N    8° 25' 26.02" E

Technical Information

Dimensions

deck depth 5.30 m
total length 660.00 m
span lengths 77.00 m - 2 × 95.00 m - 115.00 m - 2 × 97.50 m - 83.00 m
deck width 28.50 m
bridge surface 18 810 m²

Quantities

structural steel 8 108 t
concrete volume 28 245 m³
reinforcing steel 5 503 t

Cost

cost of construction ca. Euro 53 000 000

Materials

deck composite steel-reinforced concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20072987
  • Date created
    12/05/2017
  • Last Update
    13/07/2017