0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Nuremberg Junction Directional Ramp

General Information

Official designation: BW 402e
Beginning of works: 2015
Completion: 2016
Status: in use

Project Type

Location

Location: , ,
Coordinates: 49° 27' 38.61" N    11° 14' 7.78" E
Show coordinates on a map

Technical Information

Dimensions

total length 155.75 m
span lengths 37.75 m - 45.00 m - 44.00 m - 29.00 m
deck width 15.70 m
number of spans 4
bridge surface 2 445 m²
girder depth 2.60 m

Quantities

concrete volume 5 030 m³
prestressing steel 100 t
reinforcing steel 840 t
total length of piles 674 m

Cost

cost of construction ca. Euro 11 000 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2017): Chronik des Brückenbaus. In: Curbach, Manfred (2017): 27. Dresdner Brückenbausymposium., ISBN 978-3-86780-510-0, pp. 187-202.
  • About this
    data sheet
  • Structure-ID
    20072986
  • Published on:
    12/05/2017
  • Last updated on:
    29/04/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine