Münster-Süd Directional Ramp

General Information

Beginning of works: 2002
Completion: 2004
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , ,
Part of:
Coordinates: 51° 54' 57.30" N    7° 33' 33.25" E

Technical Information

Dimensions

total length 412 m
span lengths 31.5 - 58.2 m
number of spans 9
horizontal radius of curvature 340 m
total width 13.25 m
longitudinal slope max. 3.5 %
superelevation 4.5 %
piers diameter 1.60 - 2.40 m

Cost

cost of construction Euro 7 709 000

Materials

deck prestressed concrete
piers reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20017805
  • Date created
    16/09/2005
  • Last Update
    05/02/2016