0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2005
Duration of works: 1.5 months
Status: in use

Project Type

Structure: U-shaped girder bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: ,

Technical Information

Dimensions

width 4 m
span 11 m
clearance 0.5 - 3 m

Cost

cost of construction Euro 9 000

Materials

deck reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20019033
  • Published on:
    12/01/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine