0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2006
Completion: 2007
Status: in use

Project Type

Structure: Deck arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge
Construction method: deck:
Precast girders with cast-in-situ slab

Location

Location: , ,

Technical Information

Dimensions

total length 230 m
span lengths 30 m - 170 m - 30 m
number of spans 3
arch arch span 90 m

Cost

cost of construction ca. 29 000 000

Materials

arch reinforced concrete
deck slab reinforced concrete
girders precast prestressed concrete

Notes

The deck is made up of 9 spans of prefabricated, pre-tensioned inverted double-T sections – the beams are put alongside each other – and made continuous with a cast-in place deck slab. The typical deck span is 18 meters.

The foundations are cast-in-place spread footings.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20044804
  • Published on:
    08/04/2009
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine