• de
  • en
  • fr
  • International Database and Gallery of Structures

Meyssiez Viaduct

General Information

Name in local language: Viaduc de Meyssiez
Completion: 1993
Duration of works: 23.5 months
Status: in use

Project Type

Structure: Girder bridge
Function / usage: High-speed rail bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , , ,
Crosses:
  • Gère
Part of:
Coordinates: 45° 28' 27.31" N    5° 2' 44.15" E

Technical Information

Dimensions

main span 49 m
total length 538 m

Quantities

concrete volume 12 687 m³
reinforcing steel 1 426 t

Cost

cost of construction French Franc 60 200 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Checking engineering
Main contractor

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20008207
  • Date created
    13/02/2003
  • Last Update
    21/02/2017