Advertisement

Share

Follow

Mawon Second Bridge

General Information

Status: in use

Project Type

Structure: Girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , ,
Coordinates: 36° 43' 17.08" N    128° 5' 52.56" E
Show coordinates on a map

Technical Information

Dimensions

width 2 × 12.6 m
length 490.8 m
span lengths 45 m - 8 × 50 m - 45 m

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Products, Services & Reports

DYWIDAG Bonded Post-Tensioning Systems Using Strands have been used for decades: in bridge construction, the construction of reservoirs and for man ...

[more]

Advertisement

Participants

Owner
Structural engineering
Main contractor
Subcontractor
Prestressing

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20034462
  • Date created
    13/02/2008
  • Last Update
    05/02/2016