Advertisement
Share
Follow
General Information
Project Type
Structure: |
Vertical lift bridge Through truss bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge |
Location
Technical Information
Dimensions
total length | 1225.9 m | |
span lengths of main bridge | 3 × 164.6 m | |
length of movable span | 164.6 m |
Cost
cost of construction | United States dollar 12 170 000 |
Materials
towers |
steel
|
---|---|
truss |
steel
|
Chronology
1 June 1936 | Beginning of construction. |
---|---|
3 July 1937 | Opening. |
Participants
Design
Deck replacement
Structural engineering
- Charles Gozdziewski (structural engineer)
- William E. Nyman (structural engineer)
Consulting engineers
Relevant Web Sites
- About this
data sheet - Structure-ID
20006078 - Date created
11/10/2002 - Last Update
24/04/2016