0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1955
Completion: 1958
Status: demolished (2012)

Project Type

Structure: Through truss bridge
Callender-Hamilton bridge
Function / usage: Road bridge
Material: Steel bridge
Construction method: Longitudinal launching

Location

Location: , ,
,
Address: RN 13
Crosses:
  • Mandrare River
Coordinates: 25° 2' 24" S    46° 22' 38" E
Show coordinates on a map

Technical Information

Dimensions

total length 414 m

Cost

cost of construction CFA francs 400 000 000

Materials

truss steel

Participants

Design
Civil works
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20013353
  • Published on:
    15/09/2004
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine