Malaysia Singapore Second Crossing

General Information

Other name(s): Linkedua
Beginning of works: 1994
Completion: 1997
Status: in use

Project Type

Location

Location:
, ,
Coordinates: 1° 21' 18.50" N    103° 37' 38.10" E

Technical Information

Dimensions

main span 165 m
total length 2 × 1 919 m
span lengths of main bridge 96 m - 165 m - 96m
deck deck width 2 × 15 m
piles diameter of bored piles 1.5 m
main bridge
length 357 m

Quantities

concrete volume 54 000 m³
prestressing steel 2 650 t
reinforcing steel 18 000 t
number of precast segments 840

Materials

deck prestressed concrete
deck of approach viaducts precast prestressed concrete

Chronology

October 1994

Construction begins.

October 1997

End of construction.