• de
  • en
  • fr
  • International Database and Gallery of Structures

Longtanhe River Viaduct

General Information

Completion: 2009
Status: in use

Project Type

Structure: Girder bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Location

Location: ,

Technical Information

Dimensions

main span 200 m
height above valley floor or water 197 m

Materials

deck prestressed concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20052354
  • Date created
    24/01/2010
  • Last Update
    05/02/2016