• de
  • en
  • fr
  • International Database and Gallery of Structures

Limburg Viaduct

General Information

Name in local language: Lahntalbrücke Limburg
Beginning of works: 8 June 2013
Completion: 2016
Status: in use

Project Type

Location

Location: , , ,
Carries:
  • Autobahn A3
Crosses:
  • Lahn River
Part of:
Replaces: Lahntalbrücke Limburg (1965)
Coordinates: 50° 23' 19.48" N    8° 4' 48.74" E

Technical Information

Dimensions

main span 90.00 m
height 62 m
length 450.00 m
span lengths 45.00 m - 60.00 m - 75.00 m - 90.00 m - 75.00 m - 60.00 m - 45.00 m
deck width 43.90 m
bridge surface 19 755 m²
girder depth 2.50 - 5.50 m

Quantities

concrete volume 40 000 m³
prestressing steel 785 t
reinforcing steel 6 300 t
piles concrete volume 10 500 m³
total length of piles 1 950 m

Cost

cost of construction ca. Euro 35 000 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Products, Services & Reports

The old Lahntal Bridge located in Limburg dates back to the early nineteen-sixties and is 400 m long. Every day about 100,000 vehicles crossed the ...

[more]

Currently the construction of one of the busiest motorway viaducts in Germany is in full swing. The Lahntal Bridge located in Limburg dates back to ...

[more]

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20043398
  • Date created
    04/02/2009
  • Last Update
    09/07/2017