• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Kirchenwald Tunnel

General Information

Beginning of works: 1988
Completion: 2008
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: ,
Address: A2
Part of:
Coordinates: 46° 58' 44.42" N    8° 19' 46.71" E
Coordinates: 46° 59' 55.48" N    8° 18' 40.58" E
Show coordinates on a map

Technical Information

Dimensions

northern tube length 1 960 m
length of natural part 1 538 m
southern tube length 3 890 m
length of natural part 1 637 m

Cost

cost of construction Swiss Franc 450 000 000

Notes

Connection A8-Interlaken inside the tunnel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20043765
  • Date created
    21/02/2009
  • Last Update
    27/03/2018
<