Advertisement

Share

Follow

Donate

Kampmann Bridge

General Information

Name in local language: Kampmannbrücke
Beginning of works: 2017
Completion: 3rd Quarter 2019
Status: under construction

Project Type

Location

Location: , ,
Address: K 3
Crosses:
  • Ruhr River
Replaces: Kampmann Bridge (1951)
Coordinates: 51° 23' 52.30" N    7° 4' 45.05" E
Show coordinates on a map

Technical Information

Dimensions

total length 173 m
vertical navigation clearance 4.7 m
horizontal navigation clearance 20 m
deck width 11.7 m
roadway / carriageway width 2 x 3.25 m
walkway width 3.5 m
pylons pylon height (above water) 27 m
pylon height (above deck) 22 m

Design Loads

live load LM 1 (DIN Fachbericht 2009)

Cost

cost of construction Euro 12 544 300

Materials

pylons steel
deck of main bridge composite steel-reinforced concrete
abutments reinforced concrete

Advertisement

Participants

Owner
Object planning
Design
Structural engineering
Geotechnical engineering
Checking engineering
Co-contractor
Steel construction

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20075567
  • Date created
    22/07/2018
  • Last Update
    22/07/2018