Advertisement

Share

Follow

Joan Camps Footbridge

General Information

Beginning of works: December 2006
Completion: July 2007
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 41° 36' 29.21" N    2° 16' 49.68" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 20.49 m - 29.95 m - 20.49 m
bridge surface 220 m²
total width 3.78 m
walkway width 3.10 m

Cost

cost of construction (incl. taxes) Euro 642 700
cost of construction per m² Euro 2 921

Materials

piers reinforced concrete
truss Weathering steel
abutments reinforced concrete
deck flooring wood
pier heads Weathering steel

Advertisement

Participants

Architecture
Structural engineering
Site supervision
Specialist consultants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20072403
  • Date created
    09/01/2017
  • Last Update
    05/06/2019