• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Jindo Bridge

General Information

Completion: 18 October 1984
Status: in use

Project Type

Structure: Cable-stayed bridge with semi-fan system
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , ,
Next to: Jindo Bridge (2004)
Coordinates: 34° 34' 17.38" N    126° 18' 17.68" E

Technical Information

Dimensions

span lengths 70 m - 345 m - 70 m

Materials

deck steel
pylons steel

Participants

Design
Structural engineering
Contractor
Resident engineering
Technical assistance

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20004536
  • Date created
    16/08/2002
  • Last Update
    13/07/2017