Advertisement

Share

Follow

Donate

Igelsta Bridge

General Information

Name in local language: Igelstabron
Completion: 14 January 1995
Status: in use

Project Type

Structure: Box girder bridge
main bridge:
Haunched girder bridge
Function / usage: Railroad (railway) bridge
Construction method: main bridge:
Balanced cantilever method
Material: Prestressed concrete bridge

Location

Location: , ,
Coordinates: 59° 10' 3.00" N    17° 39' 59.00" E
Show coordinates on a map

Technical Information

Dimensions

total length 2 140 m
deck width 7.5 m / 12.0 m
number of spans 33
number of tracks 2-4
approach viaducts girder depth 5.0 m
main bridge span lengths 90 m - 158 m - 90 m
girder depth 6.5 - 15.4 m
vertical navigation clearance 41.6 m

Quantities

concrete volume 68 000 m³
reinforcing steel 7 000 t
formwork 167 000 m²
piers total length of piles 20 000 m

Design Loads

design speed 250 km/h

Materials

deck prestressed concrete
piers reinforced concrete

Advertisement

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20065631
  • Date created
    09/08/2013
  • Last Update
    21/10/2016