Advertisement

Share

Follow

Hvítá bridge

General Information

Beginning of works: April 1928
Completion: 1 November 1928
Duration of works: 6.5 months
Status: in use

Project Type

Structure: Deck arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: ,
Coordinates: 64° 36' 12.30" N    21° 42' 34.00" W
Show coordinates on a map

Technical Information

Dimensions

width 3 m
total length 106 m
main spans (2x) 51 m
number of spans 2

Materials

arches reinforced concrete
abutments reinforced concrete
pier reinforced concrete
piers on arch reinforced concrete

Advertisement

Participants

Structural engineering

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20071808
  • Date created
    14/10/2016
  • Last Update
    31/10/2016