0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1973
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Motorway bridge / freeway bridge
Material: Prestressed concrete bridge
Construction method: Incremental launching

Location

Location: , ,

Technical Information

Dimensions

total length 170 m
span lengths 52.50 m - 63.00 m - 52.50 m
number of spans 3
pier height 38.5 m
deck deck depth 3.00 m
deck width 10.00 m

Materials

deck prestressed concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20011015
  • Published on:
    14/12/2003
  • Last updated on:
    05/09/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine