• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Herrentunnel

General Information

Beginning of works: 2001
Completion: 26 August 2005
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , ,
Underneath of:
  • Trave
Replaces: Herrenbrücke (1964)
Coordinates: 53° 53' 58.00" N    10° 46' 4.16" E
Coordinates: 53° 54' 12.95" N    10° 46' 44.22" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 060 m
tunnel length 866 m
number of lanes 2 x 2
number of tubes 2

Design Loads

design speed 60 km/h

Cost

cost of construction German Mark 234 000 000

Materials

tunnel structure reinforced concrete

Chronology

October 2001

Construction begins.

26 August 2005

Opening to traffic

2035

End of concession

Participants

Concessionaire
Co-contractor
Subcontractor

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001365
  • Date created
    11/03/2001
  • Last Update
    11/06/2018
<