0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1960
Completion: 1964
Status: demolished (2006)

Project Type

Structure: Double-leaf bascule bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , ,
Crossed:
  • Trave
Replaces: Herrenbrücke (1902)
Replaced by: Herrentunnel (2005)
Coordinates: 53° 54' 6" N    10° 46' 21" E
Show coordinates on a map

Technical Information

Dimensions

total length ca. 550 m
bridge surface 2 195.64 m²
bascule span total length 2 x 40.66 m = 81.32 m
deck width 27 m
roadway / carriageway width 2 x 7.50 m

Materials

deck steel

Participants

Checking engineering
Co-contractor
Steel construction
Subcontractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20022294
  • Published on:
    13/07/2006
  • Last updated on:
    25/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine