Advertisement
Share
Follow
Hercilio Luz Bridge
General Information
Beginning of works: | 14 November 1922 |
---|---|
Completion: | 13 May 1926 |
Duration of works: | 3 years 4 months |
Status: | out of service |
Project Type
Structure: |
Suspension bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Location
Location: |
Florianopolis, Santa Catarina, Brazil |
---|---|
Coordinates: | 27° 35' 38.34" S 48° 33' 58.32" W |
Technical Information
Dimensions
main span | 340 m | |
total length | 819.5 m | |
pylon | pylon height | 74 m |
Materials
cables |
steel eye-bars
|
---|---|
pylons |
steel
|
deck truss |
steel
|
Chronology
13 May 1991 | Closed to all traffic. |
---|
Participants
Design
-
Robinson & Steinman
- David B. Steinman (designer)
- Holton Duncan Robinson (designer)
Structural engineering
-
Robinson & Steinman
- David B. Steinman (structural engineer)
Construction
Contractor
Relevant Web Sites
Relevant Publications
- Les grands ponts du monde: Hors d'Europe. Brissaud, Poitiers (France), pp. 177. (1990):
- Pont suspendu du type "Florianopolis". In: Acier = Stahl = Steel, v. 22 (January 1957), pp. 38-39. (1957):
- Le projet de rénovation du pont Hercilio-Luz, Brésil. In: Bulletin ouvrages métalliques, n. 3 ( 2004), pp. 158-169. (2004):
- Tierra sobre el agua. Visión histórica universal de los puentes. Colegio de Ingenieros de Caminos, Canales y Puertos, Madrid (Spain), pp. 507. (1999):
- About this
data sheet - Structure-ID
20000939 - Date created
16/09/2000 - Last Update
05/02/2016