0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2004
Completion: 21 December 2006
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
, , ,
For:
  • Autobahn A38
Part of:
Coordinates: 51° 23' 58.10" N    9° 58' 56.51" E
Coordinates: 51° 24' 17.76" N    10° 0' 18.86" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 1 724 m
tunnel section area 88 - 105 m²
number of tubes 2

Quantities

concrete volume 46 700 m³
excavated material 340 000 m³

Cost

cost of construction ca. Euro 48 000 000

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20011687
  • Published on:
    31/03/2004
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine