0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: April 2018
Completion: 30 July 2018
Duration of works: 100 days
Status: in use

Project Type

Structure: Rigid frame bridge
Support conditions:
Function / usage: Road bridge
Material: Steel-reinforced concrete composite bridge

Awards and Distinctions

2020 entry  

Location

Location: , ,
Address: Hammacherstraße
Crosses: A 46 Motorway (Germany)
Coordinates: 51° 22' 9.13" N    7° 32' 19.54" E
Show coordinates on a map

Technical Information

Dimensions

total length 42.80 m
span 39.26 m
number of spans 1
girder depth 1.47 - 1.55 m

Materials

deck slab precast reinforced concrete
abutments precast reinforced concrete
reinforced earth
main girders steel

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20077171
  • Published on:
    04/04/2019
  • Last updated on:
    04/04/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine