• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Gunkai-gawa Bridge

General Information

Completion: 2016
Status: in use

Project Type

Location

Location: , ,

Technical Information

Dimensions

total length 740 m
span lengths 92.8 m - 124.0 m - 104.0 m - 2 × 100.0 m - 124.0 m - 92.8 m
deck width 15.000 m
number of spans 7
girder depth 5.250 - 6.250 m
pier P1 height 34.0 m
pier P2 height 38.500 m
pier P3 height 28.0 m
pier P4 height 23.0 m
pier P5 height 30.0 m
pier P6 height 36.5 m
piers width 5.000 m
thickness 5.000 m
wall thickness min. 0.800 m

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Products, Services & Reports

The New Tomei Expressway on Japan's main island of Honshu connects Japan's three largest cities with each other. Located between the cities of Toyo ...

[more]

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20072891
  • Date created
    25/04/2017
  • Last Update
    09/07/2017