0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2000
Completion: 16 June 2006
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , ,
Coordinates: 57° 42' 4.83" N    11° 57' 1.47" E
Coordinates: 57° 42' 39.83" N    11° 58' 3" E
Show coordinates on a map

Technical Information

Dimensions

total length 3.3 km
tunnel length 1.6 km
number of lanes 2 x 3
number of tubes 2

Quantities

concrete volume 150 000 m³
reinforcing steel 15 000 t

Cost

cost of construction ca. Swedish crowns 3 400 000 000

Materials

tunnel structure reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20074092
  • Published on:
    27/10/2017
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine