0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Friedrich-Ebert-Brücke
Beginning of works: 1964
Completion: 28 June 1967
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Rhine River
Carries:
  • Autobahn A565
Part of:
Coordinates: 50° 45' 23.88" N    7° 6' 0.01" E
Show coordinates on a map

Technical Information

Dimensions

clearance 9 m
crossing angle 107.29 °
pier-abutments number 2
eastern approach viaduct
total length 110 m
span lengths 2 x 53.50 m
number of spans 2
main bridge
main span 280 m
total length 520.20 m
span lengths 120.10 m - 280.00 m - 120.10 m
number of spans 3
deck deck width 35.8 m
piers number 2
pylons pylon height (above deck) 53 m
western approach viaduct
main span 44 m
total length 660 m
number of spans 21
minimum span length 28 m
deck deck width 28.50 - 44 m

Materials

cables steel wire
deck steel
piers reinforced concrete
pylons steel
abutments reinforced concrete

Notes

This cable-stayed bridge was the first of the multicable type ever built.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000025
  • Published on:
    28/10/1998
  • Last updated on:
    06/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine