0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2013
Completion: 2014
Duration of works: 10 months
Status: in use

Project Type

Structure: Girder grid
Function / usage: Bus terminal
Material: Steel structure

Location

Location: , , ,
Address: Kollwitzstraße 8
Coordinates: 48° 44' 20.11" N    9° 18' 4.29" E
Show coordinates on a map

Technical Information

Materials

supports steel

Participants

Design
Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20071778
  • Published on:
    11/10/2016
  • Last updated on:
    13/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine