Beginning of works: Summer 2008
Completion: Spring 2010
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Mittellandkanal
Crosses: Mittelland Canal (1938)
Location description:

The bridge carries the Oebisfelde–Abzweig Glindenberg railroad line (route number 6409) over the Mittelland Canal near Haldensleben in the Börde district.

Coordinates: 52° 17' 43.23" N    11° 22' 48.31" E
Show coordinates on a map

Technical Information

Dimensions

total length 134.6 m
span 132.60 m
deck width 6.95 m
horizontal radius of curvature
bridge surface 1 280 m²
number of tracks 1
longitudinal slope 0 %
crossing angle 41.77 gon
abutments number 2
deck girder depth 1.70 m
suspenders number 2 x 34

Quantities

reinforcing steel content 190 kg/m³
substructure concrete volume 1 450 m³
reinforcing steel 280 t
superstructure structural steel 845 t

Design Loads

design speed 120 km/h
live load LM 71; SW/2
design code(s) DIN Fachbericht

Materials

deck steel
arches steel
abutments reinforced concrete

Replacement of the Flora Bridge near Haldensleben

In the course of the expansion of the Mittelland Canal, a replacement new construction of the existing structure became necessary. The tender included the design of a bar arch bridge. Bidders were invited to offer a special proposal for the construction of a network arch in addition to the office design.

The new superstructure was built as a single-span, single-track network arch bridge with a span of 132.60m. Ist arches have a close-welded box section with a variable height from the base of the arch to portal 2; between the inner portals, the height is a constant 700 mm. The circular arches are inclined inwards (80° inclination) in the manner of a basket-handle arch and are joined together at the apex. The arch pitch is 19.00 m. The 1700 mm high stiffening girders are designed as I-shaped welded girders with inwardly inclined web plates.

The main difference compared to the classic bar arch is the modified hanger geometry. In the network elbow, the elbow and tension band are connected by inclined hangers. These hangers are inclined in opposite directions in such a way that they cross each other at least twice. Their inclination in the plane of the sheet varies between 26 and 90 degrees. The number of hangers is relatively high at 30 hangers per arch plane, so that the distances between the hanger connections on the arch and on the stiffening girder are much smaller than in the classic bar arch bridge. This mesh geometry leads to a significant reduction in the bending moments in the arch and stiffening girder and allows these components to be designed in a material-saving way. To prevent the hangers from touching each other at the crossing points, their attachment to the arch is offset in the transverse direction.

Between the stiffening girders is the orthotropic deck consisting of deck plate, longitudinal stiffeners and cross girders. A constant spacing was chosen for the cross girders. The deck plate was stiffened with 6 trapezoidal plate stiffeners.

For reasons of construction technology, the erection was carried out approx. 18m next to the existing structure, whereby an adaptation of the railroad line including the new erection of a flyover over the national road L24 was necessary. The steel superstructure was pre-assembled on an assembly area heaped up on the western side of the Mittelland Canal. Longitudinal shifting into the final position was carried out with the aid of a pontoon. After commissioning of the replacement structure, the existing railroad bridge was dismantled.

Participants

Owner
Client
Design
Alternative design
Structural engineering
Checking engineering
Co-contractor
Construction supervision
Launching

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20059159
  • Published on:
    10/12/2010
  • Last updated on:
    16/07/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine