0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Dornbuschtunnel
Beginning of works: 23 September 1986
Completion: 1988
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel
Construction method: Cut-and-cover method

Location

Location: , , ,
Part of:
Coordinates: 50° 43' 45.31" N    9° 36' 32.96" E
Coordinates: 50° 43' 27.90" N    9° 36' 37.34" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 557 m

Cost

cost of construction German Mark 16 400 000

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20020562
  • Published on:
    21/04/2006
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine