0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Gateway Gardens S-Bahn Tunnel

General Information

Beginning of works: 2014
Completion: 2018
Status: project phase

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel
Construction method: Cut-and-cover method

Location

Location: , ,
See also: Gateway Gardens Station (2018)
Coordinates: 50° 3' 20.34" N    8° 36' 26.18" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 2 km
number of tracks 2

Design Loads

design speed 120 km/h

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20066123
  • Published on:
    28/04/2014
  • Last updated on:
    25/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine