0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: October 2003
Completion: 16 January 2007
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: New Austrian Tunnelling Method (NATM)

Location

Location:
Coordinates: 1° 17' 43.52" N    103° 50' 56.67" E
Coordinates: 1° 17' 51.88" N    103° 50' 47" E
Show coordinates on a map

Technical Information

Dimensions

length 350 m
number of lanes 3

Participants

Contractor

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20054654
  • Published on:
    04/03/2010
  • Last updated on:
    29/01/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine