General Information

Beginning of works: 1984
Completion: 1991
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , ,
Coordinates: 59° 18' 45" N    18° 4' 21" E
Show coordinates on a map

Technical Information

Dimensions

length 1 550 m

Excerpt from Wikipedia

The Söderledstunneln ("South Way Tunnel") is a tunnel between the Central Bridge and the Johanneshov Bridge on the island of Södermalm in Stockholm. It is 1,550 metres long and traverses the island from north to south.

Building started on 9 October 1984. On the stretch between Brännkyrkagatan and Folkungagatan an earlier tunnel called Södergatan had been built in 1944 in a cut-and-cover trench. Between 1964–1966, it was extended 150 metres under Åsö High School.

At the start of the 1980s, the decision was taken to build a tunnel to alleviate the congestion south of Högbergsgatan, and then to rebuild the existing northern tunnel. Work finished on schedule in January 1991.

The tunnel is actually two tubes of 7.25 metres wide apiece, with each carrying two lanes of traffic. The height is 4.5 metres, with 110 metres of the length cut out of the rock and the rest being concrete lined.

Text imported from Wikipedia article "Söderledstunneln" and modified on 23 July 2019 under the CC-BY-SA 3.0 license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20027105
  • Published on:
    28/02/2007
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine