0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1940
Completion: 1950
Status: in use

Project Type

Location

Location: , ,
Impounds:
  • Ruhr River
Supports: Bridge over the Kettwig Weir (1950)
Coordinates: 51° 21' 38.93" N    6° 56' 10.13" E
Show coordinates on a map

Technical Information

Dimensions

retained water volume 1 430 000 m³

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008602
  • Published on:
    13/03/2003
  • Last updated on:
    29/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine