0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1950
Completion: 1 March 1951
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Main River
Replaces: Wilhelmsbrücke (1848)
Coordinates: 50° 6' 3.43" N    8° 40' 0.49" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 36.00 m - 40.00 m - 48.00 m - 40.00 m - 36.00 m - 26.80 m - 25.84 m - 26.48 m
number of spans 8
vertical navigation clearance 6.85 m
abutments number 2
deck deck width 29.50 m
number of longitudinal girders 2 x 2

Cost

cost of construction German Mark 4 510 000

Materials

deck slab reinforced concrete
girders steel

Chronology

25 February 1951

Load testing.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005228
  • Published on:
    20/09/2002
  • Last updated on:
    10/11/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine