0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1998
Status: in use

Project Type

Structure: Cable-supported structure
Function / usage: Opera house

Location

Location: , , ,
Coordinates: 35° 45' 50.40" N    105° 56' 49.20" W
Show coordinates on a map

Technical Information

There currently is no technical data available.

Excerpt from Wikipedia

Santa Fe Opera (SFO) is an American opera company, located 7 miles (11 km) north of Santa Fe, New Mexico. After creating the Opera Association of New Mexico in 1956, its founding director, John Crosby, oversaw the building of the first opera house on a newly acquired former guest ranch of 199 acres (0.81 km²).

The company has presented operas each summer festival season since July 1957, and is internationally known for introducing new operas as well as for its productions of the standard operatic repertoire. Since its inception, Santa Fe Opera has staged 43 American premieres and 15 world premieres, as of 2017.

Original theatre, 1957 to 1967

The totally open-air theatre was designed to seat 480 and was built for $115,000 on a site carefully selected by Crosby and an acoustician friend, who fired off a series of rifle shots until they found the perfect natural location for an outdoor theatre. It was "the only outdoor theatre in America exclusively designed for opera". Audience members sat on benches. The architectural design calculations for the theatre were performed by Sergio Acosta, a structural engineer and immigrant from Panama who graduated from the University of Texas and was a resident of Albuquerque, NM from 1948 until his death at age 78.

This was the location of the inaugural performance on opening night, 3 July 1957. Madama Butterfly played to a sold-out crowd. By the end of the eight-week season, the 12,000 people who attended accounted for sales at 90% of capacity.

A mezzanine was added in 1965 but, on 27 July 1967, four weeks into the season, a fire destroyed the theatre, causing the company to move to a local downtown high school for the remainder of the season. From the Sweeney Gymnasium, they created the "Sweeney Opera House", and completed the season, albeit without most of the original costumes or sets. A huge fund-raising operation took place, backed by Igor Stravinsky, and $2.4 million was raised to rebuild the theatre in time for the following season.

Rebuilt theatre, 1968 to 1997

Built for the 1968 theatre and known as the B-Lift, this elevator raises scenery from the storage area three floors below the stage to stage level

The second theatre, a new open-air house seating 1,889, was ready for the start of the new season on 26 June 1968. Just like the company's opening night in 1957, it presented Puccini’s Madama Butterfly.

The new theatre was designed by the Santa Fe firm of McHugh and Kidder. One of its principal features was the partial opening of the roof towards the middle of the orchestra section, provided by the curving, audience-facing slope of the stage roof and the thrust of the mezzanine and rear orchestra roof forward. Also, the auditorium's sides were open, as was the rear of the stage (although sliding doors could be closed). It provided for spectacular Westward views – as well as giving some centrally located audience members a view of the night sky.

Most of the new theatre's backstage facilities, including scenery construction and storage and costume and props production, were actually constructed below the stage level in order to preserve the open views to the West. Additionally, a large elevator, located immediately behind the stage and known as the "B-Lift", was included and it became the means whereby scenery could be moved up one level from the scene construction shop to the stage or up or down two levels to or from the large scenery storage area located three levels below the stage. The elevator still remains in place.

Crosby Theatre, since 1998

Renamed the Crosby Theatre (following the founder's death in 2002 and also reflecting the contributions of both of his parents in supporting the opera festival), the present theatre was designed by the architectural firm headed by James Polshek of New York.

It was built during extensive reconstruction, which followed the tearing down of the auditorium of the 1968 theatre at the end of the opera season in late August 1997. The stage and backstage facilities such as dressing rooms and the costume shop as well as the scenery construction shop remained in place. The new theatre was completed in ten months for an early July 1998 opening of a new season. Like the previous opening nights of 1957 and 1968, it featured a performance of Madama Butterfly this time sung by Miriam Gauci, the Maltese soprano who had her debut in the same role at the SFO in 1987.

With fewer storm-related problems (and, with a higher stage roof providing a better view of the Westward landscape), the theatre now seats 2,128 plus 106 standees, although it has a strikingly intimate feel. It added a wider and more complete roof structure, with the new front and rear portions supported by cables and joined together with a clerestory window. This offers protection from the sky, but with the sides remaining open to the elements. The presence of wind baffles and, since 2001, Stieren Hall, the orchestra's rehearsal hall, has helped improve exposure on the southern, windward side of the auditorium.

In 1999, as an alternative to installing a translation system using the projected supertitles (or surtitles), an electronic titles system was installed in the Crosby Theatre. Invented by Figaro Systems of Santa Fe (and only the second one installed after the Metropolitan Opera's Met Titles in 1995), the system provides small rectangular electronic screens in front of each patron's seat, showing a two-line translation of the sung text in either English or Spanish. The system has the possibility of handling up to six languages.

Stieren Orchestra Hall

Completed for the 2001 season under the patronage of Arthur and Jane Stieren, the hall fulfills the long-standing need for an orchestra rehearsal hall. Constructed on three levels with a total of 12,650 square feet (1,175 m²), the building is also used for lectures, recitals, and social events.

On its main level, guide rails attached to the ceiling indicate the dimensions of the theatre's main stage and offstage wings. This allows for scenery to be placed correctly, with access via large sliding doors from the scenery deck level, thus allowing fully staged rehearsals. The upper level contains rehearsal studios for one-on-one coaching for singers while the lower level features a large air-conditioned costume storage facility.

Rehearsal halls

Eight rehearsal halls exist on the campus grounds. They vary in size from the reproduction of the full-scale of the Crosby Theatre's stage and down to individual coaching studios for one-on-one coaching. Of the former group, the newest, completed for the 2010 season, is the Richard Gaddes Rehearsal Hall. It complements the existing full-size O'Shaughnessy Hall, which was rehabilitated for the 2012 season. In addition, six other halls of varying sizes allow several productions to be rehearsed simultaneously.

Dapples Pavilion, new cantina

The original "cantina" dating from the 1970s was completely torn down after the 2007 season and construction of a new one was completed in time for the opening of the 2008 season. It contains modern kitchen facilities, new serving stations, and generally good protection from the rain for its patrons. Its arching roof matches the architectural lines of the Crosby Theatre and it bears some resemblance to the roofline of Denver Airport.

Now known as the Dapples Pavilion (named after long-time supporter Florence Dapples), the cantina supplies season-long food and drink for the staff and artists from breakfast time to mid-afternoon. In addition, it functions as the location for pre-performance Preview Buffet dinners for up to about 200 members of the general public in the evenings. The evening includes an introductory talk about the evening's opera.

Text imported from Wikipedia article "Santa Fe Opera" and modified on 23 July 2019 under the CC-BY-SA 3.0 license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20039040
  • Published on:
    13/08/2008
  • Last updated on:
    16/05/2015
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine