Advertisement

Share

Follow

Commodore Schuyler F. Heim Bridge

General Information

Beginning of works: 1946
Completion: 10 January 1948
Status: demolished (12 October 2015)

Project Type

Structure: Vertical lift bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Replaced by: Commodore Schuyler F. Heim Bridge (2017)
Coordinates: 33° 45' 58.05" N    118° 14' 22.92" W
Show coordinates on a map

Technical Information

Dimensions

main span 55 m

Advertisement

Participants

Rehabilitation (2005)
Owner
(role unknown)

Relevant Web Sites

Relevant Publications

  • Yashinsky, Mark (2007): Terminal prospect. In: Bridge Design & Engineering, v. 13, n. 47 (2nd Quarter 2007), pp. 63-65.
  • Ciolko, Adrian / Weinmann, Thomas (2005): Made to measure. In: Bridge Design & Engineering, v. 11, n. 41 (4th Quarter 2005), pp. 30.
  • About this
    data sheet
  • Structure-ID
    20019979
  • Date created
    12/03/2006
  • Last Update
    10/06/2017