• de
  • en
  • fr
  • International Database and Gallery of Structures

Columbia River Highway

General Information

Beginning of works: 1913
Completion: 1922
Status: in use

Project Type

Function / usage: Road connection

Location

km Name

Technical Information

Dimensions

length 128 km

Chronology

1913

Construction begins.

1922

Construction complete.

1963
- 1980

Portions demolished for Interstate 84 construction.

1983

Historic designation.

2000

Mosier Twin Tunnels reopened.

2007

Oneonta Tunnel excavated.

Participants

(role unknown)

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Dykman, Pieter T. / Norman, James B. / Smith, Dwight A. (1989): Historic Highway Bridges of Oregon. 2nd edition, Oregon Historical Society, Portland (USA), pp. 132-160.
  • About this
    data sheet
  • Structure-ID
    10001044
  • Date created
    14/03/2007
  • Last Update
    30/07/2015